Due to scheduled maintenance, some areas of our Shop and Manage Plan pages are currently inaccessible. Thank you for your patience.

Please reach out to sales@eonesolutions.com with any questions.

Managing Integration Schedules

Published: Aug 19, 2024

Managing Integration Schedules

Published: Aug 19, 2024

From the Process Scheduling window, all scheduled integrations can be viewed and edited.

Schedule Insights

  • Integration – Integration linked to the schedule
  • Description – Description of integration linked to schedule
  • Enabled – Whether the schedule is enabled or disabled
  • Next Run – Date and time of next scheduled run
  • Schedule Type – Type of schedule (Daily, Weekly, Monthly, Once)
  • Expand Integration Runs – Display last 100 schedule runs

Icon Dictionary

A useful list of icons and their meanings.

IconDescription
Schedule enabled
Schedule disabled
Integration in progress
Integration locked and can’t be ran manually
Does not allow long running schedule
Allows long running schedule
Stop current schedule run
Edit schedule
Delete schedule
Disable schedule
Content
Schedule Insights Icon Dictionary

Feeling stuck? Get the support and guidance you need to help you power through any data challenge

Reset Filters