Integration log show status on lookup form
The Integration log feature doesnt show status of task until it is opened.
the form “integration run lookup” lists run number along with the date, but impossible to tell from this which are successful and which are failures until they are selected and opened. for scheduled integrations there will be thousands of these to look through!
even integration manager logs you could see in the list of run jobs which were successful and which had failed. makes it so much easier to track down errors.
The event log viewer is a bit more informative, but when there are dozens of integrations running its like looking for needle in a haystack!